Interface Newshub
NewsPower

TCN Upgrades Egbin 330/132/33kV Substation


The Transmission Company of Nigeria has upgraded its Egbin 330/132/33kV Transmission Substation with the installation of a 60MVA 132/33kV power transformer. The transformer which was installed by TCN in-house engineers was energized at about 13.05pm on the 2nd of March 2022.
With the new 60MVA power transformer, the substation capacity to supply bulk electricity to Ikeja Electricity Distribution company has increased by 30MVA. This is because TCN has decommissioned an old 30MVA transformer within the substation, which will be serviced and moved to other areas within its network that has a history of minimal electricity demand.
This substation capacity upgrade will ensure that more power is made available for IKEDC to take to its franchise areas within Ijeda LCDA and Ikorodu Local Government area axis.

Related posts

Husband, Collaborators Who Plotted, Executed Abduction, Murder of Wife Nabbed

Dayo Omoogun

FAAC Shares N1,127.408trn Among 3 Tiers, Leaving N546,822 Balance of Gross Revenue

Dayo Omoogun

SMAGOGA Urges Edo Govt to Return School to Catholic Mission

Dayo Omoogun

Leave a Comment